Kostenloser Auftragsdauerrechner
Schaetzen Sie, wie lange ein Auftrag oder Projekt dauert, basierend auf Gesamtarbeitsstunden, Mitarbeiterzahl und Arbeitsstunden pro Tag.
Working Days Needed
7
Working Days Needed vs Total Work Hours Needed
Formel
How to Calculate Job Duration
Formula
Days Needed = Total Work Hours / (Number of Workers x Hours Per Day)
This gives you the minimum calendar days required. In practice, add buffer time for weather delays, material availability, inspections, and other interruptions.
Lösungsbeispiel
A project requires 200 work-hours with 4 workers working 8 hours per day.
- 01Daily crew output = 4 workers x 8 hours = 32 hours/day
- 02Days needed = 200 / 32 = 6.25, rounded up to 7 days
- 03Weeks needed = 7 / 5 = 1.4 weeks
- 04Hours per worker = 200 / 4 = 50 hours
Häufig Gestellte Fragen
How do I account for delays?
Add a buffer of 10-20% to your estimated days. For outdoor projects, add more for weather delays. For complex projects, consider dependencies between tasks that may prevent parallel work.
Does adding workers always reduce duration?
Not always proportionally. Adding workers increases coordination overhead. There is also a physical limit to how many workers can operate in a space. Beyond a certain point, more workers can actually slow things down.