Project Cost Calculator Formula

Understand the math behind the project cost calculator. Each variable explained with a worked example.

Formulas Used

Subtotal (before contingency)

subtotal_display = subtotal

Contingency Amount

contingency_amount = subtotal * contingency_pct / 100

Total Project Cost

total_cost = subtotal * (1 + contingency_pct / 100)

Variables

VariableDescriptionDefault
laborLabor Costs(USD)12000
materialsMaterial Costs(USD)8000
equipmentEquipment Costs(USD)2000
overheadOverhead Costs(USD)3000
contingency_pctContingency(%)10
subtotalDerived value= labor + materials + equipment + overheadcalculated

How It Works

How to Estimate Project Costs

Formula

Total Cost = (Labor + Materials + Equipment + Overhead) x (1 + Contingency%/100)

A contingency budget covers unexpected costs, change orders, and price fluctuations. Industry standard is 5-15% depending on project complexity and risk.

Worked Example

A remodeling project with $12,000 labor, $8,000 materials, $2,000 equipment, $3,000 overhead, and 10% contingency.

labor = 12000materials = 8000equipment = 2000overhead = 3000contingency_pct = 10
  1. 01Subtotal = $12,000 + $8,000 + $2,000 + $3,000 = $25,000
  2. 02Contingency = $25,000 x 10% = $2,500
  3. 03Total project cost = $25,000 + $2,500 = $27,500