容量因子计算器
使用容量因子计算器评估发电设施的实际运行效率。输入额定功率和实际发电量,计算风电、太阳能或其他电站的容量因子百分比,优化能源项目评估。
Capacity Factor
14.3 %
Capacity Factor vs Time Period
公式
Power Plant Capacity Factor
The capacity factor measures how much energy a plant actually produces compared to its theoretical maximum if it ran at full power continuously.
Formula
Capacity Factor = Actual Output / (Rated Capacity x Hours) x 100%
Typical capacity factors: Nuclear 90-93%, Natural gas 40-60%, Wind onshore 25-45%, Solar PV 15-30%. Higher factors mean better utilization of installed capacity.
计算示例
A 2 MW wind turbine produces 2,500 MWh in one year (8,760 hours).
- 01Maximum output = 2 MW x 8,760 hr = 17,520 MWh
- 02Capacity factor = 2,500 / 17,520 x 100 = 14.3%
- 03Unused capacity = 17,520 - 2,500 = 15,020 MWh
常见问题
Why is solar capacity factor so low?
Solar panels only generate power during daylight and output varies with clouds and seasons. A 25% capacity factor means the panels average one quarter of their peak rating.
Does a low capacity factor mean the plant is inefficient?
Not necessarily. Wind and solar have low capacity factors due to weather variability, not mechanical inefficiency. The metric reflects resource availability.
Can capacity factor exceed 100%?
In rare cases, a plant may briefly exceed its nameplate rating under favorable conditions, but sustained capacity factors above 100% are not possible.